Project

Supply, manufacture and assembly of structure for coal transport silo band.

VALE COAL

Location: MINA EL HATILLO LA LOMA CESAR

Date: 2008-01-01
Description
Manufacturing and assembly of the porticos, main towers, lattice sections, railings, gratings, and walkways with their foot guards. Threading of 1,200 meters of 54” coal conveyor belt at 60 meters high, driven by two 300 hp drive systems, including the assembly and mounting of pulleys and counterweight system.